35 Years

RTI Terminals

Stacker/Reclaimer

We have three stacker/reclaimers for the handling of dry bulk product at the terminal.

Tandem Rotary Dumper

Our tandem rotary dumper operates continuously to unload the railcars from unit trains. The rotary dumper can unload trains without the need to separate the railcars from each other.

Vessel Berth & Loading

The berth can accept Capesize vessels up to 250,000 dead weight tonnes, with a maximum length of 325 meters, a 50 meter beam and 20 meter draft.

History

Established in 1983, the construction of Ridley Terminals was a joint venture between the Federal Government and Federal Commerce & Navigation, in support of coal developments in northeast British Columbia. In 1991 the Federal Government became sole owner of the terminal, making Ridley Terminals Inc. a Federal Crown Corporation.

RTI received its first train of coal in November 1983, and the first ship, the Shoryu Maru, was loaded on January 7, 1984. The official opening of Ridley Terminals was on June 8, 1984. The total tonnage shipped from RTI in 1984 was 5.5 million tonnes.

Get In Touch!

Contact Us
Copyright© 2020 Ridley Terminals Inc.. All Right Reserved
Terms of UseDisclaimerPrivacySite map